Still up on Blocks – Making Progress

Friday I stopped by the boat yard between meetings and took a look at how things were progressing.

Week 2 - Paint Work done..
Week 2 – Paint Work done..

The keel work and bottom paint was complete, the fridge keel cooler was installed, and it was clear someone had started looking at running the coax up the mast (or down depending on where you start from) for the over-the-air TV antenna.

Keel - faired, re-epoxied, and painted
Keel – faired, re-epoxied, and painted

I met up with the paint guy to approve the work I can actually afford and table the rest, and then got an update on some of the remaining projects.  All in all a good visit.

I also heard back from PYI who informed me that the propeller reconditioning should be complete on 12/2.

New keel cooler on the right, pre-existing one on th left.
New keel cooler on the right, pre-existing one on th left.

Take a look at this meticulous work by CSR Marine installing the new keel cooler!

New Keel cooler lines cleanly installed and routed
New keel cooler lines cleanly installed and routed